Capacity assurance for high-density data centers

Know if it fits
before the racks ship.

A high-density workload has to clear power, cooling, floor space and budget at the same time. Today those four checks happen in four inboxes, over several days, and nobody checks them together — so approvals that are each correct can still add up to a plan that cannot be built. GridMind checks joint feasibility in minutes and writes down why.

32.9 MW
IT load under assessment
600
racks across 4 zones
placements assessed
minutes
instead of days

Assess a placement

Four specialist assessments plus reconciliation, typically 60–90 seconds. This is a public demonstration environment, so assessments are rate limited to one per 90 seconds.

Facility iad-dc-01 · Ashburn, Virginia

Four zones, 600 racks, 32.9 MW IT load, 136 racks free. Each zone is checked against every limit that applies to it, and ruled out by whichever one it fails first.